Technology focus

Styromax. Built lighter, faster, greener.

The heart of the system is a single panel in expanded polystyrene — modular, not prefabricated — enclosed by a double-galvanized steel mesh, industrially produced and completed on site with two layers of concrete.

The system

Anatomy of a panel.

Self-supporting panels in various shapes cover the entire range of elements needed to finalise any building — even in earthquake-prone areas and climate extremes.

1

EPS core

Shaped expanded polystyrene slab for heat insulation and soundproofing.

2

Double-galvanized steel mesh

Two electro-welded meshes enclose the core.

3

Connectors

Double steel connectors join the meshes through the panel.

4

Two concrete layers

Applied on site to complete the structural element.

Panel explorer

Six panels. Every element of a building.

Hover or tap through the range.

Single Panel renderPCS

Classification & use

Single Panel

Designed for load-bearing external and internal walls (up to 4 storeys), partitions, claddings, and insulated roof configurations. Certified globally (ETA Europe, ICC-ES & DRJ USA).

Performance

  • Thermal transmittance PCS08: 0.577 W/m²K
  • PCS12: 0.396 W/m²K
  • PCS16: 0.300 W/m²K
  • vs. standard brickwork K = 1.7

Performance

Up to 82% better insulation than brick.

Thermal transmittance

U-value in W/m²K — lower is better

Acoustic insulation

37 dB

PCS08, standard plaster

47 dB

PCS16, 20/160/20 plaster

Fire resistance

REI 120

120 minutes structural fire integrity at 18cm thickness

Manufacturing

The 7-stage factory process.

From polystyrene bead to stitched panel on our automated line.

Raw Material Preparation
01Stage 1 of 7

On site

The construction process.

Light enough to place by hand. Clean enough for any site.

Panels are easy and rapid to carry and handle, placed by hand and connected with a pneumatic gun or ordinary building wire. On site, panels can be carried by one or two workers even when measuring over 4 sq.m, and placed by a single worker without a lifting machine — no need for skilled labour, though skilled crews raise productivity markedly.

Advantages

Twelve reasons to build green.

Hover a tile for detail.

Thermal Insulation

U-values as low as 0.300 W/m²K versus 1.7 for standard brickwork.

Rapid Installation

Up to 70% faster assembly; panels placed by hand without lifting machinery.

Cyclone Resistance

A monolithic, mesh-reinforced shell suited to climate extremes.

Integration with other building systems

Modularity affords high degrees of integration with other building systems.

Wide Selection of Finishes

Plaster of any type sprays directly onto the zinc-coated net; tile and stone overlays accepted.

Versatility

Earthquake-resistant buildings from 1 up to 20 storeys, simple to complex.

Cost Effectiveness

High-quality structures at a very economical price through efficient movement and assembly.

Fire Resistance

REI 120 — 120 minutes structural fire integrity at 18cm thickness.

Sustainability and Energy Efficiency

Replaces carbon-heavy masonry with a factory-precision, low-waste system.

Earthquake Resistance

Advanced seismic resistance for earthquake-prone areas.

Blast Resistance

Electro-welded double steel meshes joined by connectors form a resilient shell.

Load Resistance

Double panels comply with EUROCODE 2 for high-load structural applications.

Raw materials

Two materials, precisely specified.

Polystyrene beads of certified quality, expandable with or without additives for self-extinguishing (EPS/FR) behaviour. Supplied in 125kg drums (stockable up to 3 months) or 100kg BIN containers (up to 4 weeks).

Galvanized steel wire — zinc-coated, low carbon (below 0.10%), tensile strength above 70kg/m², diameter 2.5 to 3.5mm, supplied in coils.

Mortar dosage by weight

1 m³of mortar
Cement(6 × 50kg bags)
300 kg
Sand
1,350 kg
Water
130 litres

Simulation

Build time estimator.

Move the sliders to compare an illustrative programme.

100
4

The system supports earthquake-resistant buildings from 1 up to 20 storeys.

Illustrative simulation, not a quotation. Applies only the stated “up to 70% faster assembly” to a simple baseline. Costs depend on design, site and specification.

Traditional masonry~58 weeks
Styromax system~17 weeks

Illustrative time saved

~41 weeks

Up to 70% faster assembly